Header image alt text

Joyce Clark Unfiltered

For "the rest of the story"

Disclaimer: The comments in this blog are my personal opinion and may or may not reflect an adopted position of the city of Glendale and its city council.

On November 21, 2023, at city council workshop, the long-awaited revised Economic Impact Study for VAI Resort and Mattel Adventure Park was released. The numbers are just astounding and are shared here.

The project has grown considerably since it was first envisioned and presented to the city. The Applied Economics Study presented this project description:

“The development includes 10 mixed-use buildings. Buildings 5 and 8 will open at the end of 2024 and the remainder of the development will open in summer 2025.

  • VAI Resort Hotel

    Building 1 will include a 299-room luxury hotel with 17,000 square feet of restaurants, 18,000 square feet of retail shops and 130 underground parking spaces.

  • Building 2 will include 29,500 square feet of retail and restaurants, a 9,000 square foot spa, a 155-room hotel and 230 underground parking spaces.
  • Building 3 is a parking structure with 3,900 spaces.
  • Building 4 will include 47,000 square feet of restaurants and themed retail, an aerophile balloon, a 3,000-seat theater, an 8,000 square foot Barbie theater and a 19,000 square foot Barbie Dream House attraction.
  • Building 5 will include a 9-acre Mattel Adventure Park with 250,000 square feet of indoor and outdoor rides and amusements and 8,000 square feet of themed restaurants.
  • Building 6 will include a 311-roon hotel, 28,000 square feet of retail and restaurants, an 8,500 square foot kid’s club and 150 underground parking spaces.
  • Building 7 will include 70,000 square feet of meeting and convention space, a 20,000 square foot night club, a 10,000 square foot fitness center and a 10,000 square foot swim up bar.
  • Building 8 will include 318 hotel rooms, including the Amphitheater Tower with 27,000 square feet of sky boxes overlooking the 90,000 square foot concert venue. This area also includes 37,000 square feet of restaurant space, a 4,500 square foot retail/café area and 390 underground parking spaces.
  • Building 9 represents Konos Island in the middle of the swimming area with 40,000 square feet of island beach amenities, 10,000 square feet of restaurant space, and the elevated Aerobar attraction.
  • Building 10 includes 55,000 square feet of corporate office space occupied by the developer/owner.
  • Other Amenities include the beach and pool decks, service areas, and 1,060 surface parking spaces.”

In summary and please note that my numbers are estimated based on available information, there will be on the site including both VAI and Mattel Adventure Park:

  • 1,013 hotel rooms available in a 5-building complex
  • 5,860 parking spaces on site including 900 underground; 3,900 in a parking garage; and 1,060 surface parking spaces.
  • 100,500 square feet of restaurants
  • 108,500 square feet of retail space
  • 387,500 square feet of attractions

It should be noted that that estimates of development costs and revenues earned are conservative as can be shown by a conservative estimate of 4 of the hotels’ occupancy rate of 42% to 46% and one hotel at an occupancy rate of 66%. Please note in the Westgate area, hotels are averaging a 70% occupancy rate.

In total, there will be 2,346,523 square feet of development at a cost of over $900,000,000 (nearly $1 billion dollars). The magnitude and complexity of this development should not be underestimated. It is not like building a one-themed development such as a single, large manufacturing facility or a hotel or a retail center. Rather, it is building all these combined and more at once.

The project site is forecast to earn $2.2 billion dollars in new sales, property and bed tax revenues to the city, schools, county and state over the next 25 years. How is Glendale incentivizing this $1 billion dollar project? It will waive permit and plan fee waivers of up to $1 million dollars and enter a Government Property Lease Excise Tax (GPLET) agreement on the entertainment, recreation, and concession portions of the development. In total, all fee waivers and the GPLET is $107.4 million dollars over 25 years in return for a 25 year income of $2.2 billion dollars.

How does the 25-year revenue break down? Starting in the year 2025 Glendale is estimated to receive annual tax revenue of $29,318,615 and to receive $40, 289,165 by year 2049. That means each year Glendale will receive $29 plus million dollars escalating to $40 million dollars a year by 2049. That is more revenue than that earned by the city from the Arrowhead/Bell Road corridor per year. These revenues go a long way in making up for the state-imposed loss of approximately an annual $14 million in rental tax that cities can no longer collect.

With the GPLET the County and Schools will receive $7,833,554 in year 2025 annually escalating to $18,972,199 by 2025. The State is estimated to receive $45,768,687 in year 2025 annually escalating to $50,980,151. The current and potential revenues to school and county districts are:

  • Pendergast Elementary School District currently receives $55,452 in tax revenue. Even with a GPLET it will receive $2,906,600 annually.
  • Tolleson Union School District currently receives $51,883 in tax revenue and with the GPLET will receive $2,719,506 annually.
  • WESTMEC currently receives $1,765 in tax revenue and with the GPLET will receive $92,498 annually.
  • Community Colleges currently receive $11,121 in tax revenue and with the GPLET will receive $582,938 annually.
  • All other taxing districts (county) currently receive $32,997 in tax revenue and with the GPLET will receive $1,734,838 annually.

These statistics should give you a sense of the magnitude of this development. This development will solidify Glendale as THE Entertainment and Sports destination not only in the state but nationally.

I am so pleased and excited about this development that I have arranged to do a half hour “Beyond the Headlines” on each component, VAI Resort and Mattel Adventure Park. Taping of the videos will occur in January 2024. Expect them to be on air toward the end of February 2024.

© Joyce Clark, 2023     

FAIR USE NOTICE

This site contains copyrighted material the use of which is in accordance with Title 17 U.S. C., Section 107. The ‘fair use’ of any such copyrighted material as provided for in Section 107 of the US Copyright Law and who have expressed a prior interest in receiving the included information for research and educational purposes. For more information material on this site is distributed without profit to those who have not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democratic, scientific and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such material. For more information go to http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use,’ you must obtain permission from the copyright owner.

Prayers for Kathie and Hans

Posted by Joyce Clark on November 19, 2023
Posted in City issue and actionsCity of Glendale  | Tagged With: , , , | 1 Comment

Disclaimer: The comments in this blog are my personal opinion and may or may not reflect an adopted position of the city of Glendale and its city council.

This is a blog that just had to be written. Two terrible tragedies have occurred – one during the past month and the other very recently.

Kathie Roe, a longtime friend, died on October 27, 2023, in a house fire. The cause of the fire is under investigation. It is a horrible, unimaginable way to go. I only hope she was overcome by smoke before the flames reached her.

I had known Kathie for over 20 years. She was a pistol. She was passionate and compassionate. No matter what task Kathie committed to, she was like the energizer bunny. She put her heart and soul into every project. Kathie’s latest commitment to Glendale, among many over the years, was as a commissioner on the Parks and Recreation Commission. Kathie cared deeply about Glendale, and it showed in her words, deeds, and actions.

She was taken too soon and will be deeply missed by all who knew her. God grant her peace. Please pray for Kathie that she is in the loving arms of God.

The other tragedy is not a tragedy but an evil act. On Wednesday, November 15, 2023, around 6:15 p.m. at the intersection of 51st Avenue and Peoria Avenue in Glendale, Hans Schmidt, in a senseless act of violence, was shot. He and his family had recently moved to Glendale. He is 26 years old and has already served his country as a military medic. He is a husband and the father of two children. He is the outreach director at Victory Chapel in Glendale.

He was shot in the head and is in critical condition, in intensive care and stable. Victory Chapel started a fund in Schmidt’s name for medical expenses. Please click on this link to donate for Hans and his family: https://www.givelify.com/donate/NjI3NDk=/donation/amount . Any amount, even one dollar, is appreciated.

The two most important things in his life are his family and his faith. He has his whole life before him. Hans was doing an act he had done many times before, standing at the intersection encouraging all who passed by to attend his church, Victory Chapel. Who, in their right mind, would try to destroy a man of faith? As I said, someone who is pure evil.

What is even more shocking is that it occurred in Glendale. Glendale is not the big city like Phoenix. It still retains its hometown feel and you can see it and feel it as you drive through our downtown. To have something like this occur here is beyond our imagination. It makes you realize that no matter where you live, you can be touched by evil. I do not like what our country has become and I suspect that many of you feel the same way.

Peoria Avenue and 51st Avenue is a busy intersection with hundreds of vehicles passing through each hour. There is someone out there who saw something or heard something about this act.

If you know anything about this senseless act, please call the Glendale Police Department at 623-930- 3000, the non-emergency line.

Both Kathie and Hans need your prayers. Please pray for them.

© Joyce Clark, 2023     

FAIR USE NOTICE

This site contains copyrighted material the use of which is in accordance with Title 17 U.S. C., Section 107. The ‘fair use’ of any such copyrighted material as provided for in Section 107 of the US Copyright Law and who have expressed a prior interest in receiving the included information for research and educational purposes. For more information material on this site is distributed without profit to those who have not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democratic, scientific and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such material. For more information go to http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use,’ you must obtain permission from the copyright owner.

Disclaimer: The comments in this blog are my personal opinion and may or may not reflect an adopted position of the city of Glendale and its city council.

I am so pleased and excited to give you an update on the Heroes Park sports fields. I expect construction to begin early next year (2024) and to be completed by December 2024. However, an additional hurdle will be to gain council approval for additional funding for the project. Due to continued inflation price increases for all components, it will require council approval for the additional cost increase. Council approval will be sought later this month (November).

I have included the final conceptual, but it may be hard to read so I will offer some of the more prominent elements for you. The sports fields complex’s location is to the northeast of the existent library and directly north of the existing ramadas. The main components are 3 soccer fields. There are 8 pickle ball courts with shade sails and 3 adjoining ramadas. A centralized, large ramada and restroom is just south of the soccer fields.

In between the 2 large open lawns is a children’s play area. South of the pickle ball courts is a shaded picnic area. South of the picnic area is a food truck court designed specifically to encourage food trucks to come to the park. Southeast of the picnic area and food court area is a 1.6-acre dog park.

North of the sports fields is a pollinator garden and a fitness loop with fitness nodes. There is a generous amount of landscape buffering between the sports fields and the homes to the north and east of the park. A generous and shaded pathway is provided between the library and the sports fields area as well as a raised intersection and crosswalk from the existing ramadas to the sports fields. Included are 390 parking spaces located to the east and west of the sports fields.

You know, this park was approved by the city in 1998, 25 years ago. During my years in office, I have consistently advocated for its completion. I have been successful in getting a library that can expand, a fishing lake and now the sports fields complex.

This area of Glendale warrants the park’s completion, including finally, the design and construction of the long-awaited Recreation/Aquatic Center. With all the new residential construction of single-family homes as well as 15 apartment complexes, the population of the Yucca district has exploded from 41,000 to an estimated 55,000 people. The tremendous population growth that has occurred is now seeking recreational opportunities.

It isn’t just the people of the Yucca district that will benefit from a Recreation/Aquatic Center at Heroes Park, but the residents of the Ocotillo and Cactus districts will benefit as well. Did you know that nearly 70% percent of all the city’s recreational programming occurs at Foothills Recreation/Aquatic Center? For all who live in south Glendale it’s a 10-mile trip, one way, to Foothills. That’s a long haul for many families. A Recreation/Aquatic Center at Heroes Park will redress this imbalance and provide programming for many families and children in south Glendale. It’s time…

I want to thank the councilmembers who have remained steadfast in the city’s pledge to finish this park. It simply would not have occurred without their support.

It would be wonderful if you would take the time to thank them as well and ask for their support in completing Heroes Park by approving the funding for the design and construction of the last element – the Recreation/Aquatic Center by emailing them at:

© Joyce Clark, 2023     

FAIR USE NOTICE

This site contains copyrighted material the use of which is in accordance with Title 17 U.S. C., Section 107. The ‘fair use’ of any such copyrighted material as provided for in Section 107 of the US Copyright Law and who have expressed a prior interest in receiving the included information for research and educational purposes. For more information material on this site is distributed without profit to those who have not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democratic, scientific and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such material. For more information go to http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use,’ you must obtain permission from the copyright owner.

Disclaimer: The comments in this blog are my personal opinion and may or may not reflect an adopted position of the city of Glendale and its city council.

I am pleased to announce that Glendale citizens have approved both bond questions in yesterday’s election. Question 1 authorizes additional bonding capacity of $82 million for street and intersection improvements and Question 2 authorizes capacity of $78 million for public safety. In both cases, no new bonds will be issued until there is the city’s capacity to pay them off without increasing your property taxes.

Here are the results posted by the Maricopa County elections department.

  • On Question 1, streets, 21,279 or 17.87% of all Glendale registered voters voted.
  • There were 12,061 (57.03%) voters who approved of the question.
  • There were 9,089 (42.97%) who voted ‘no’ on the question.
  • On Question 2, public safety, 21,279 or 17.87% of all Glendale registered voters voted.
  • There were 12,699 (60.06%) who approved of the question.
  • There were 8,446 (39.94%) who voted ‘no’ on the question.

I am waiting for the Canvass of Votes to see how those numbers break down by district. I expect to see the total number of votes cast in each district as well as how many were ‘yes’ votes and how many were ‘no’ votes by district. When I have that information, I will share the data in another blog.

Over the next 5 to 10 years, I look forward to the construction of street and public safety projects that will benefit all of us. For Yucca district residents, passage of the street bonds means we can finally see the reconstruction of 83rd Avenue between Glendale Avenue and Northern Avenue, a street I have characterized as “Alligator Alley” because the road is so rough, and it zig zags from a single lane in each direction to a double lane and then back to a single lane.

These questions passed because of the tremendous support offered by ordinary citizens, Glendale’s Bond Committee and most importantly, the hard work of the firefighters’ and police officers’ unions. Their strong advocacy for passage of the bonds played a critical role in their passage. They recognized how much the anticipated projects would help them to be more effective in providing essential services to everyone in Glendale.

The Mayor and Councilmembers Hugh, Malnar and I were in total support of both bond questions. Councilmembers Aldama, Tolmachoff and Turner, not so much. Keep in mind that city councilmembers could not advocate for or against the bonds in their official capacities but privately, if asked, they could convey their support for or against the bond questions.

It’s a good day for Glendale as it continues to build a stronger and safer community for all its residents.

Thank you to the 12,000+ registered voters who shared their optimism and support for Glendale.

© Joyce Clark, 2023     

FAIR USE NOTICE

This site contains copyrighted material the use of which is in accordance with Title 17 U.S. C., Section 107. The ‘fair use’ of any such copyrighted material as provided for in Section 107 of the US Copyright Law and who have expressed a prior interest in receiving the included information for research and educational purposes. For more information material on this site is distributed without profit to those who have not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democratic, scientific and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such material. For more information go to http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use,’ you must obtain permission from the copyright owner.

Disclaimer: The comments in this blog are my personal opinion and may or may not reflect an adopted position of the city of Glendale and its city council.

I think there are many Glendale residents who may be unaware of the impending start of the Downtown Campus Renovation Project (DCRP). Our city hall has stood proudly at the intersection of 59th Avenue and Glendale Avenue for 40 years.

The building is old. Its A/C, plumbing and electrical are at the point of constant repair. It’s possible to continue to pour money into continuing repairs or to finally bite the bullet and renovate the building. Also 40 years old are the parking garage, the Council Chambers, the Amphitheater and Murphy Park. The parking garage leaks every time it rains, Council Chambers A/C is stuck on perpetual cold, the Amphitheater no longer has the sound infrastructure to support entertainment groups and in Murphy Park the trees are dying.

I am very proud and excited to be part of this momentous project. You should be too. Our signature city hall building will reflect the spirit of today’s Glendale.

The images presented here are conceptual only and have not been finalized or approved by the City Council. Our city hall is the heart of downtown. With the announcement of its renovation, various developers have expressed an interest in renovating older buildings or taking down vacant parcels for new projects.  Its renovation has sparked renewed interest in our downtown. This project will make our amphitheater a true destination location able to accommodate a wider variety of entertainment. This renovation will finally create a “One Stop Shop”, a centralized location for all our citizens to access all city services in one location. Need a building permit? You will be able to access that service at our One Stop Shop. Need to pay your water bill? The One Stop Shop will be where you go. Need a copy of a public record? Visit the One Stop Shop.

Murphy Park, while retaining its unique, historical character, will be retrofitted with lush landscaping with plenty of trees providing shade. The amphitheater will have permanent seating available as well as a shade structure.

City Hall will provide a new, updated workspace for its employees while the exterior look of the building will reflect a Glendale that has proven itself to be the epicenter of all the amazing accomplishments that have occurred over the past 40 years that it has existed.

City Council has had a series of public workshop meetings regarding this project. Citizens have had many opportunities to weigh in. Unfortunately, while many downtown shop owners have participated, not many citizens from other parts of the city have used the public meetings to get involved.

Construction is slated to begin this month and the completion of the renovation and move in is expected to occur in the Winter of 2025. To date the council has seen possible concepts for the city hall renovation and surrounding area. In an upcoming workshop we will be presented with a final, suggested concept that will be shared with the public for further comments before the final design is approved by the city council.

© Joyce Clark, 2023     

FAIR USE NOTICE

This site contains copyrighted material the use of which is in accordance with Title 17 U.S. C., Section 107. The ‘fair use’ of any such copyrighted material as provided for in Section 107 of the US Copyright Law and who have expressed a prior interest in receiving the included information for research and educational purposes. For more information material on this site is distributed without profit to those who have not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democratic, scientific and social justice issues, etc. We believe this constitutes a ‘fair use’ of any such material. For more information go to http://www.law.cornell.edu/uscode/17/107.shtml. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use,’ you must obtain permission from the copyright owner.